Science DiagramBETA v0.2
Papers · Assignments · Lessons · Sci-Diagram Studio

Turn the concept in your head
into a classroom-ready diagram.

For research papers, assignments and lessons — describe the diagram you need and get a fully labeled, publication-ready figure in seconds. Every label is editable, so nothing is wrong where it matters.

✓ Accurate labels ✓ Edit text after generation ✓ PNG for papers, posters & slides
Join the Telegram communityAsk questions, share your figures, get help from the maintainer→
LABELED · EDITABLEReal output: water cycle diagram (middle-school preset, unedited)OUTPUT · 16:9 · PNG
Real output: water cycle diagram (middle-school preset, unedited)
20+curriculum presets
59real samples, not mockups
6pluggable image models
≈90sper classroom-ready figure
Generators · one for every concept

Pick a chapter, get a diagram

How it works

Three steps from concept to slide

01

Pick a preset or describe

Choose a subject & grade preset, or type e.g. “convex lens ray diagram, object between F and 2F”.

02

AI plans, then draws

The AI first lists the must-have labels (nothing missing), then renders a textbook-style diagram.

03

Edit text, download, teach

OCR every label and fix any of them without re-rolling; download PNG straight into PowerPoint or Google Slides.

Open the studio and generate your first diagram →

Frequently asked questions

Is Science Diagram free?

Yes — Science Diagram is free while in beta. Each account can create 8 diagrams per day for free (an edit counts as one), and each diagram takes about 2 minutes. Need more? Join our Telegram group and ask the maintainer.

Which languages are supported?

The interface and diagram labels support 8 languages: English, 中文, Español, Português, Français, Deutsch, Русский and 日本語. Labels are rendered in the language you choose.

Can I edit the text inside a generated diagram?

Yes. The system detects every label in the image so you can edit them line by line, or circle an area with the brush and describe the change — only the marked part is repainted, the rest stays identical.

Can I use the diagrams in my slides or worksheets?

Yes. Diagrams download as 16:9 PNG files that drop straight into PowerPoint or Google Slides. Please verify AI-generated content before classroom use.

How accurate are the labels?

Before rendering, the AI plans a must-have label list based on the subject and grade level, so nothing essential is missing. Every sample on this site is a real, unedited output.

How long does it take to generate a diagram?

About 90 seconds. Text edits and partial repaints take a similar time, since only the changed part is regenerated.